Transmission shunt capacitor bank required under the Coega / Eastern Cape network development plan - Eskom (Transmission), South Africa, 2008
PSD performed detailed component rating and harmonic tuning studies for the shunt capacitor banks.

Sakaka shunt capacitor banks - Saudi Electricity Company (SEC), Saudi Arabia, 2006
Completed a harmonic integration study for the shunt capacitor banks at Sakaka A & B.

Transmission shunt capacitor bank installations at Esselen, Athene and Mersey Substations - Eskom (Transmission), South Africa, 2006
Assignment involved detailed rating and harmonic tuning studies for the shunt capacitor banks.

Motraco 400kV and 275kV shunt capacitor filter bank project - Motraco and Alstom South Africa, 2003
PSD was responsible for the complete engineering design, technical project management and testing and commissioning of the banks.

Series capacitor project 380kV - Saudi Electric Company (SEC), Saudi Arabia, 2002
Electro-magnetic transient (EMT) studies, power quality assessments, and harmonic measurements on the Saudi Arabia (Eastern Region) 380 kV series compensated system. Series capacitor bank specifications and technical support during project execution (design review, etc).

…top

» Studies & Designs » Static VAr Compensators
» Shunt & Series    Compensation » Generation
Services | Projects | About Us | Links                                                                                                                                  Terms & Conditions | Site Map
© PSD Consulting Engineering (Pty) Ltd. All Rights Reserved.                                                                                                             an IMcKDesign site