Omburu Substation: 40MVAr Shunt Capacitor Bank Installations
divider

Namibia

Client: NamPower

Project Status: Completed in 2008

Omburu SubstationProject Outline
NamPower investigated the addition of 1 x 40MVAr shunt capacitor banks at their existing Omburu substation in the north of Namibia. A previously conducted network planning study showed that the new capacitor(s) provides critical voltage support to the exiting networks. In addition, it will also support future generation and transmission system developments. The critical consideration of this project was to determine the tuning frequency and damping level of the filter in this relatively weak network.

Services to Client

On-site harmonic measurements
Capacitor bank harmonic integration study
Functional specification

Project Detail
The study included:

Electrical parameter optimisation for the capacitor banks
Information review and Network model
Background Harmonic Measurements
Frequency scan and resonance studies utilising DigSILENT simulation program
Harmonic integration study including selection of appropriate capacitor bank configuration
Functional Specification

…top

» Network Studies » Static VAr Compensators
» Shunt & Series    Compensation » Generation
Services | Projects | About Us | Links                                                                                                                                  Terms & Conditions | Site Map
© PSD Consulting Engineering (Pty) Ltd. All Rights Reserved.                                                                                                             an IMcKDesign site